The Kárahnjúkar 700 MWe hydro power project in NE-Iceland - Challenges during the construction and completion phase
Author
Petursson, Guomundur
Author_Institution
Landsvirkjun Power, Reykjavik
fYear
2008
fDate
20-24 July 2008
Firstpage
1
Lastpage
3
Abstract
The presentation explains the basic layout of the 700 MW Karahnjukar Hydroelectric Project being constructed in north-eastern Iceland by Landsvirkjun, the National Power Company, and near to completion now. The challenges during construction, particularly the difficulties related to the extensive underground works, the Project includes extreme long headrace and access tunnels of around 75 km. The main dam construction is also explained as well as the challenging commissioning work for the generating units and the time constraints of the project. All 6 generating units are already in operation.
Keywords
construction industry; dams; hydroelectric power stations; tunnels; access tunnels; construction; dam construction; hydro power project; Concrete; Delay; Filling; Geology; Reservoirs; Rivers; Slabs; Springs; Time factors; Water resources; Construction; hydro;
fLanguage
English
Publisher
ieee
Conference_Titel
Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century, 2008 IEEE
Conference_Location
Pittsburgh, PA
ISSN
1932-5517
Print_ISBN
978-1-4244-1905-0
Electronic_ISBN
1932-5517
Type
conf
DOI
10.1109/PES.2008.4596945
Filename
4596945
Link To Document