    The Kárahnjúkar 700 MWe hydro power project in NE-Iceland - Challenges during the construction and completion phase

  • Author

    Petursson, Guomundur

  • Author_Institution
    Landsvirkjun Power, Reykjavik
  • fYear
    2008
  • fDate
    20-24 July 2008
  • Firstpage
    1
  • Lastpage
    3
  • Abstract
    The presentation explains the basic layout of the 700 MW Karahnjukar Hydroelectric Project being constructed in north-eastern Iceland by Landsvirkjun, the National Power Company, and near to completion now. The challenges during construction, particularly the difficulties related to the extensive underground works, the Project includes extreme long headrace and access tunnels of around 75 km. The main dam construction is also explained as well as the challenging commissioning work for the generating units and the time constraints of the project. All 6 generating units are already in operation.
  • Keywords
    construction industry; dams; hydroelectric power stations; tunnels; access tunnels; construction; dam construction; hydro power project; Concrete; Delay; Filling; Geology; Reservoirs; Rivers; Slabs; Springs; Time factors; Water resources; Construction; hydro;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century, 2008 IEEE
  • Conference_Location
    Pittsburgh, PA
  • ISSN
    1932-5517
  • Print_ISBN
    978-1-4244-1905-0
  • Electronic_ISBN
    1932-5517
  • Type

    conf

  • DOI
    10.1109/PES.2008.4596945
  • Filename
    4596945