DocumentCode :
2548237
Title :
Research on lead time of supply chain and its interrelated cost
Author :
Lin, Qiang ; Li, Qing ; Shi, Hui
Author_Institution :
Dept. of Logistic Eng., Tianjin Univ., Tianjin, China
fYear :
2009
fDate :
21-23 Oct. 2009
Firstpage :
1569
Lastpage :
1573
Abstract :
On the basis of comprehensive analysis of the lead-time (LT) of supply chain(SC) and the research of the interrelated cost, with setting related assumptions, the mode of lead-time reduction and related costs that faces the two-echelon supply chain composed of manufactures and suppliers is established. Finally, it is concluded that the total cost in the two-echelon supply chain is the convex function of the lead time. Besides, the total cost will be obtained at each interval end point. Through the concrete cases, after clashing the lead-time, the manufacturer´s cost will decrease, while the supplier´s cost will increase. What´s more, the range of decreasing cost is greater than that of the increasing cost. Therefore, transferred payment is needed to properly compensate the supplier.
Keywords :
costing; lead time reduction; supply chain management; convex function; interrelated cost; interval end point; lead-time reduction; manufacturer cost; supplier cost; transferred payment; two-echelon supply chain; Assembly; Constitution; Costs; Emulation; Engineering management; Logistics; Manufacturing; Production; Supply chain management; Supply chains; Lead-time reduction; manufacturer´s cost; supplier´s cost; supply chain coordination;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Engineering Management, 2009. IE&EM '09. 16th International Conference on
Conference_Location :
Beijing
Print_ISBN :
978-1-4244-3671-2
Electronic_ISBN :
978-1-4244-3672-9
Type :
conf
DOI :
10.1109/ICIEEM.2009.5344375
Filename :
5344375
Link To Document :
بازگشت