• DocumentCode
    2551376
  • Title

    A model for multi-stage production planning with load dependent lead times

  • Author

    Woodruff, D.L. ; Voss, Stephan

  • Author_Institution
    University of California
  • fYear
    2004
  • fDate
    5-8 Jan. 2004
  • Firstpage
    88
  • Lastpage
    96
  • Abstract
    As organizations move from creating plans for individual production lines to entire supply chains it is increasingly important to recognize that decisions concerning utilization of production resources impact the lead times that will be experienced. In this paper we give some insights into why this is the case by looking at the queuing that results in delays. We have then used these insights to suggest an optimization model that takes into account load dependent lead times and routing alternatives.
  • Keywords
    Lot sizing; Management information systems; Production facilities; Production planning; Production systems; Resource management; Routing; Subcontracting; Supply chain management; Supply chains;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    System Sciences, 2004. Proceedings of the 37th Annual Hawaii International Conference on
  • Conference_Location
    Big Island, HI
  • Print_ISBN
    0-7695-2056-1
  • Type

    conf

  • DOI
    10.1109/HICSS.2004.1265247
  • Filename
    1265247