DTCTP with renewable and nonrenewable resources
Author
Peng, WuLiang ; Yu, Hong
Author_Institution
Sch. of Econ. & Manage., Shenyang Ligong Univ., Shenyang
fYear
2008
fDate
2-4 July 2008
Firstpage
170
Lastpage
175
Abstract
The traditional DTCTP is improved to a new multi-mode resource-constrained DTCTP model (MRC-DTCTP). Referring to the multi-mode resource-constrained project scheduling problem (MRCPSP), both the renewable resources and nonrenewable resources constraints are added to DTCTP. By predefining the resource price, the renewable resources are related to the project costs, including direct cost and indirect cost. Every activity can be executed in the crashing way in which the project direct costs are used to shorten the activity duration. According to the characteristics of the MRC-DTCTP, a brand and bound algorithm for solving it is developed. Finally an entire time-cost tradeoff curve for a project network is drawn, and it is shown that MRC-DTCTP can effectively help to balance the relationship between project duration and cost.
Keywords
computational complexity; renewable energy sources; scheduling; tree searching; brand and bound algorithm; multi-mode resource-constrained project scheduling problem; nonrenewable resources; renewable resources; time-cost tradeoff curve; Computer crashes; Costs; Discrete Time-cost Trade-off; Planning and Scheduling; Project Management; Project Scheduling;
fLanguage
English
Publisher
ieee
Conference_Titel
Control and Decision Conference, 2008. CCDC 2008. Chinese
Conference_Location
Yantai, Shandong
Print_ISBN
978-1-4244-1733-9
Electronic_ISBN
978-1-4244-1734-6
Type
conf
DOI
10.1109/CCDC.2008.4597292
Filename
4597292
Link To Document