    DTCTP with renewable and nonrenewable resources

  • Author

    Peng, WuLiang ; Yu, Hong

  • Author_Institution
    Sch. of Econ. & Manage., Shenyang Ligong Univ., Shenyang
  • fYear
    2008
  • fDate
    2-4 July 2008
  • Firstpage
    170
  • Lastpage
    175
  • Abstract
    The traditional DTCTP is improved to a new multi-mode resource-constrained DTCTP model (MRC-DTCTP). Referring to the multi-mode resource-constrained project scheduling problem (MRCPSP), both the renewable resources and nonrenewable resources constraints are added to DTCTP. By predefining the resource price, the renewable resources are related to the project costs, including direct cost and indirect cost. Every activity can be executed in the crashing way in which the project direct costs are used to shorten the activity duration. According to the characteristics of the MRC-DTCTP, a brand and bound algorithm for solving it is developed. Finally an entire time-cost tradeoff curve for a project network is drawn, and it is shown that MRC-DTCTP can effectively help to balance the relationship between project duration and cost.
  • Keywords
    computational complexity; renewable energy sources; scheduling; tree searching; brand and bound algorithm; multi-mode resource-constrained project scheduling problem; nonrenewable resources; renewable resources; time-cost tradeoff curve; Computer crashes; Costs; Discrete Time-cost Trade-off; Planning and Scheduling; Project Management; Project Scheduling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Control and Decision Conference, 2008. CCDC 2008. Chinese
  • Conference_Location
    Yantai, Shandong
  • Print_ISBN
    978-1-4244-1733-9
  • Electronic_ISBN
    978-1-4244-1734-6
  • Type

    conf

  • DOI
    10.1109/CCDC.2008.4597292
  • Filename
    4597292