Title :
Research on the pantograph performance evaluation criterion of B3 high-speed train
Author :
Guoqiang Cai ; Yu Liang ; Xiao Ming ; Yang
Author_Institution :
State Key Lab. of Rail Traffic Control & Safety, Beijing Jiaotong Univ., Beijing, China
Abstract :
The suitability of catenary directly affects the performance of current collecting between the pantogragh and catenary, in a general way whether the catenary has large unsuitability, namely hard spot, is depended on which if the maximum associated with the vertical impact acceleration of pan-head within each segment is larger than a given threshold, it will be calculated by fuzzy c-mean algorithm. Linear regression is used to equal the speed, which eliminates the influence of speed on the maximum associated with the vertical impact acceleration of pan-head. The result shows that threshold of the hard spot calculated by FCM algorithm is reasonable.
Keywords :
pantographs; performance evaluation; regression analysis; B3 high speed train; FCM algorithm; catenary; fuzzy c-mean algorithm; hard spot; linear regression; pantograph performance evaluation; Acceleration; Clustering algorithms; Equations; Fault detection; Laboratories; Linear regression; Partitioning algorithms; Rail transportation; Railway electrification; Traffic control; catenary; fuzzy c-mean algorithm; hard spot; linear regression; threshold;
Conference_Titel :
Information Management and Engineering (ICIME), 2010 The 2nd IEEE International Conference on
Conference_Location :
Chengdu
Print_ISBN :
978-1-4244-5263-7
Electronic_ISBN :
978-1-4244-5265-1
DOI :
10.1109/ICIME.2010.5478125