DocumentCode
2555952
Title
Integrated tundish plan in the steel industry
Author
Dong, Hongyu ; Huang, Min ; Wang, Xingweri ; Zheng, Binglin
Author_Institution
Fac. of Inf. Sci. & Eng., Northeastern Univ., Shenyang
fYear
2008
fDate
2-4 July 2008
Firstpage
1008
Lastpage
1012
Abstract
According to making good use of tundish in the integrated steel-making industry, the integrated tundish plan is described firstly, Secondly, a nonlinear integer programming (NIP) model is introduced in detail considering width jump limit, thickness jump limit, due date limit, flow limit, steel grade limit and the tundish capacity limit; To solve this model, an efficient variable neighborhood search (VNS) is introduced by using hamming distance to define the neighborhoods; Finally, the computational experiment shows that the model and algorithm are efficient.
Keywords
integer programming; nonlinear programming; steel industry; hamming distance; integrated tundish plan; nonlinear integer programming; steel-making industry; variable neighborhood search; Metals industry; Integrated Tundish Plan; NIP; Planning and Scheduling; VNS;
fLanguage
English
Publisher
ieee
Conference_Titel
Control and Decision Conference, 2008. CCDC 2008. Chinese
Conference_Location
Yantai, Shandong
Print_ISBN
978-1-4244-1733-9
Electronic_ISBN
978-1-4244-1734-6
Type
conf
DOI
10.1109/CCDC.2008.4597464
Filename
4597464
Link To Document