DocumentCode
2557613
Title
“SIG-NABOUT”-the development and trial of a novel junction design
Author
Webb, P.J.
Author_Institution
Transport Res. Lab., UK
fYear
1994
fDate
26-28 Apr 1994
Firstpage
106
Lastpage
110
Abstract
The idea of this new type of junction was first suggested by Kimber and Semmens in 1982. The junction was later named a “SIG-NABOUT” because it combines the features of a SIGnalled junction and a roundABOUT. A junction of this type was tested by the Transport Research Laboratory (TRL) on its test track, with promising results. Simulation techniques also gave an indication of the capacity which could be achieved from such junctions. TRL then looked for support from the Department of Transport (DoT) to carry out a full scale public road trial, to confirm the benefits promised by the necessarily small scale track trial. A suitable public road site at Sefton (near Liverpool) was provided by the North West Regional Office of DoT. The existing roundabout was suffering from considerable congestion in the traffic peak periods, and it was decided to convert it into a SIG-NABOUT. The conversion was completed in 1993. The paper outlines the design and control principles of a SIG-NABOUT and reports on the road trial
Keywords
road traffic; traffic control; Department of Transport; Liverpool; North West Regional Office; SIG-NABOUT; Sefton; Transport Research Laboratory; public road trial; roundabout; signalled junction; test track;
fLanguage
English
Publisher
iet
Conference_Titel
Road Traffic Monitoring and Control, 1994., Seventh International Conference on
Conference_Location
London
Type
conf
DOI
10.1049/cp:19940435
Filename
385786
Link To Document