• DocumentCode
    2558766
  • Title

    Test wafer control system in 300 mm FAB

  • Author

    Hsu, Jer-Wei ; Lo, Hsi-Lo ; Pan, Cheng-Chung ; Chen, Yi-Ming ; Hsieh, Teng-Ko

  • Author_Institution
    Powerchip Semicond. Corp., Hsinchu, Taiwan
  • fYear
    2004
  • fDate
    9-10 Sept. 2004
  • Firstpage
    33
  • Lastpage
    36
  • Abstract
    Test wafers are used in wafer fabrication to monitor equipment stability and product quality. Any shortage causes the loss of equipment capacity and production move. On the contrary, to prepare more test wafers to avoid shortage spends more cost, occupies more storage space, and lowers transfer efficiency. Considering the wafer cost and FAB productivity, an efficient control system of test wafer in 300 mm FAB is much more important than formerly.
  • Keywords
    costing; integrated circuit testing; process control; process monitoring; quality management; semiconductor device manufacture; stability; 300 mm; FAB productivity; equipment stability; product quality; test wafer control system; wafer cost; wafer fabrication; Automatic control; Automation; Control systems; Costs; Dispatching; Real time systems; Recycling; Safety; Surface cleaning; System testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Semiconductor Manufacturing Technology Workshop Proceedings, 2004
  • Print_ISBN
    0-7803-8469-5
  • Type

    conf

  • DOI
    10.1109/SMTW.2004.1393710
  • Filename
    1393710