Title :
Advantage of On-Line Partial Discharge continuous monitoring of medium voltage substation
Author :
Blokhintsev, Igor ; Patterson, Calvin L. ; Cassidy, Brian J. ; Loesch, Armin H.
Author_Institution :
Eaton Corp., Minnetonka, MN, USA
fDate :
May 31 2009-June 3 2009
Abstract :
On-line continuous partial discharge measurements of medium voltage substations have not attracted the same attention in the electrical community as compared to similar PD measurements of rotating machines. The cost of an unexpected outage however may be considerably more significant of a main distribution bus than just for a single motor failure. This paper discusses pros and cons of PD measurements using multiple sensors for additional noise reduction and localizing PD activity for measurements made in higher frequency bands. The importance of continuous PD monitoring vs. periodic walk in PD measurements of switchgear is also discussed considering that PD activity in switchgear can have very unstable activity highly dependent on ambient conditions. Negative periodic PD tests in switchgear can result in a false sense of security. Case studies from field experience are presented to support the discussions.
Keywords :
electric sensing devices; monitoring; partial discharge measurement; substations; switchgear; medium voltage substation; multiple sensors; noise reduction; online partial discharge continuous monitoring; partial discharge measurements; single motor failure; switchgear; Electric variables measurement; Frequency measurement; Medium voltage; Monitoring; Noise measurement; Partial discharge measurement; Partial discharges; Rotation measurement; Substations; Switchgear;
Conference_Titel :
Electrical Insulation Conference, 2009. EIC 2009. IEEE
Conference_Location :
Montreal, QC
Print_ISBN :
978-1-4244-3915-7
Electronic_ISBN :
978-1-4244-3917-1
DOI :
10.1109/EIC.2009.5166335