DocumentCode
2565367
Title
Implementation of large-scale equipment in cement production plants
Author
Tigges, Alexander
fYear
2007
fDate
April 29 2007-May 2 2007
Firstpage
123
Lastpage
128
Abstract
Worldwide cement consumption is currently growing with record figures and the increase of new production capacities is almost double compared to the long-term mean value. Therefore cement producers, especially from rapidly growing countries and regions with a booming construction business, are demanding cement production lines of highest capacity. The need of high capacity combined with limited space for installation and various considerations regarding operation and costs leads to the development and implementation of large-scale equipment. In order to reach this objective various hurdles had to be cleared at first. Process related issues require new design concepts, already existing designs must be checked and adjusted because of the necessary scale-up, fabrication, as well as logistics and transportation, are confronted with new challenges by the extreme dimensions and weights of the various equipment parts alone. My company has met these challenges by developing new products and putting them successfully on the market. Among these is our new vertical roller mill, which, for more than seven years now offers a highly efficient, reliable and compact raw grinding system serving high capacity modern clinker production lines. Also our new clinker cooler, as well as our modern equipment for combi-grinding facilities, represent ideal products for modern high capacity clinker production lines. Their special and unique design features secure highest operational flexibility and availability. Just recently various plants with large-sized equipment and high capacities have been commissioned, e.g. the so far world´s largest vertical roller mill for raw material grinding and a new clinker production line with a potential capacity of more than 10,000 tpd in the Middle East. Experiences gained from this give valuable feedback and know-how for the further development and installation of even bigger equipment and plants
Keywords
cement industry; commissioning; design engineering; grinding machines; industrial plants; installation; reliability; rollers (machinery); rolling mills; cement consumption; cement producers; cement production plants; clinker production lines; commissioning; construction business; design concepts; grinding system; installation; large-scale equipment; logistics; reliability; transportation; vertical roller mill; Availability; Costs; Fabrication; Feedback; Large-scale systems; Logistics; Milling machines; Production systems; Raw materials; Transportation;
fLanguage
English
Publisher
ieee
Conference_Titel
Cement Industry Technical Conference Record, 2007. IEEE
Conference_Location
Charleston, SC
ISSN
1079-9931
Print_ISBN
1-4244-1195-5
Electronic_ISBN
1079-9931
Type
conf
DOI
10.1109/CITCON.2007.358992
Filename
4198210
Link To Document