• DocumentCode
    2567683
  • Title

    Project scheduling using state-based probabilistic decision networks

  • Author

    Ioannou, Photios G. ; Martinez, Julio C.

  • Author_Institution
    Dept. of Civil & Enivron. Eng., Michigan Univ., Ann Arbor, MI, USA
  • Volume
    2
  • fYear
    1998
  • fDate
    13-16 Dec 1998
  • Firstpage
    1287
  • Abstract
    The paper presents probabilistic CPM scheduling using an add-on program to the STROBOSCOPE simulation system that allows dependence and correlation between activity durations as well as control over precedence and the selection of paths. Activity durations and sequencing can be defined in terms of the dynamic information that becomes available as a project evolves and includes the actual start date and duration of activities already started. An example highway project illustrates the modeling power of this approach
  • Keywords
    civil engineering computing; critical path analysis; decision diagrams; digital simulation; probability; scheduling; STROBOSCOPE simulation system; activity durations; add-on program; dependence; dynamic information; highway project; modeling power; probabilistic CPM scheduling; project scheduling; start date; state based probabilistic decision networks; Civil engineering; Computer languages; Costs; Dynamic scheduling; Multiuser detection; Probability distribution; Road transportation; Uncertainty; Vehicle dynamics; Vehicles;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Simulation Conference Proceedings, 1998. Winter
  • Conference_Location
    Washington, DC
  • Print_ISBN
    0-7803-5133-9
  • Type

    conf

  • DOI
    10.1109/WSC.1998.745992
  • Filename
    745992