DocumentCode :
2567683
Title :
Project scheduling using state-based probabilistic decision networks
Author :
Ioannou, Photios G. ; Martinez, Julio C.
Author_Institution :
Dept. of Civil & Enivron. Eng., Michigan Univ., Ann Arbor, MI, USA
Volume :
2
fYear :
1998
fDate :
13-16 Dec 1998
Firstpage :
1287
Abstract :
The paper presents probabilistic CPM scheduling using an add-on program to the STROBOSCOPE simulation system that allows dependence and correlation between activity durations as well as control over precedence and the selection of paths. Activity durations and sequencing can be defined in terms of the dynamic information that becomes available as a project evolves and includes the actual start date and duration of activities already started. An example highway project illustrates the modeling power of this approach
Keywords :
civil engineering computing; critical path analysis; decision diagrams; digital simulation; probability; scheduling; STROBOSCOPE simulation system; activity durations; add-on program; dependence; dynamic information; highway project; modeling power; probabilistic CPM scheduling; project scheduling; start date; state based probabilistic decision networks; Civil engineering; Computer languages; Costs; Dynamic scheduling; Multiuser detection; Probability distribution; Road transportation; Uncertainty; Vehicle dynamics; Vehicles;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Simulation Conference Proceedings, 1998. Winter
Conference_Location :
Washington, DC
Print_ISBN :
0-7803-5133-9
Type :
conf
DOI :
10.1109/WSC.1998.745992
Filename :
745992
Link To Document :
بازگشت