DocumentCode
2567683
Title
Project scheduling using state-based probabilistic decision networks
Author
Ioannou, Photios G. ; Martinez, Julio C.
Author_Institution
Dept. of Civil & Enivron. Eng., Michigan Univ., Ann Arbor, MI, USA
Volume
2
fYear
1998
fDate
13-16 Dec 1998
Firstpage
1287
Abstract
The paper presents probabilistic CPM scheduling using an add-on program to the STROBOSCOPE simulation system that allows dependence and correlation between activity durations as well as control over precedence and the selection of paths. Activity durations and sequencing can be defined in terms of the dynamic information that becomes available as a project evolves and includes the actual start date and duration of activities already started. An example highway project illustrates the modeling power of this approach
Keywords
civil engineering computing; critical path analysis; decision diagrams; digital simulation; probability; scheduling; STROBOSCOPE simulation system; activity durations; add-on program; dependence; dynamic information; highway project; modeling power; probabilistic CPM scheduling; project scheduling; start date; state based probabilistic decision networks; Civil engineering; Computer languages; Costs; Dynamic scheduling; Multiuser detection; Probability distribution; Road transportation; Uncertainty; Vehicle dynamics; Vehicles;
fLanguage
English
Publisher
ieee
Conference_Titel
Simulation Conference Proceedings, 1998. Winter
Conference_Location
Washington, DC
Print_ISBN
0-7803-5133-9
Type
conf
DOI
10.1109/WSC.1998.745992
Filename
745992
Link To Document