DocumentCode :
2568308
Title :
Infrastructure requirements for selected management practices
Author :
Satir, Ahmet
Author_Institution :
Dept. of Decision Sci. & Manage. Inf. Syst., Concordia Univ., Montreal, Que., Canada
fYear :
1996
fDate :
18-20 Aug 1996
Firstpage :
600
Lastpage :
604
Abstract :
Three management practices (Business Process Reengineering, Total Quality Management and Just in-Time) are revised in the context of a proposed business mission and operating paradigm for production enterprises. The infrastructure requirements for these practices are presented with respect to macro, operational and organizational requirements
Keywords :
production control; quality control; stock control; systems analysis; systems re-engineering; business process reengineering; infrastructure requirements; just in-time; operating paradigm; operational requirements; organizational requirements; production enterprises; total quality management; Business process re-engineering; Cost function; Delay; Hardware; Logistics; Production; Supply chain management; Supply chains; Technology management; Total quality management;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Engineering and Technology Management, 1996. IEMC 96. Proceedings., International Conference on
Conference_Location :
Vancouver, BC
Print_ISBN :
0-7803-3552-X
Type :
conf
DOI :
10.1109/IEMC.1996.547887
Filename :
547887
Link To Document :
بازگشت