Title :
Insulation coordination, environmental and system analysis of existing double circuit line reconfigured to six-phase operation
Author :
Stewart, James R. ; Oppel, Laurie J. ; Thomann, Gary C. ; Dorazio, T.F. ; Brown, Matthew T.
Author_Institution :
Power Technologies Inc., Schenectady, NY, USA
Abstract :
Conversion of an existing double circuit 115 kV overhead transmission line near Binghamton, New York to six-phase operation will provide a commercial demonstration of feasibility of high phase order power transmission. Analyses of insulation performance, corona and field effects, and load flow and system stability have been performed as part of the preliminary engineering for this project. These studies are summarized, and it is shown that operation at six-phase is possible with a 40% increase in phase-to-ground voltage and a doubling of surge impedance loading
Keywords :
corona; insulation co-ordination; load flow; power overhead lines; 115 kV; 6-phase operation; Binghamton; New York; corona; double circuit overhead transmission line; field effects; insulation performance; load flow; phase-to-ground voltage; stability; surge impedance loading; Circuit stability; Corona; Insulation; Load flow; Load flow analysis; Performance analysis; Power engineering and energy; Power transmission; Power transmission lines; Stability analysis;
Conference_Titel :
Transmission and Distribution Conference, 1991., Proceedings of the 1991 IEEE Power Engineering Society
Conference_Location :
Dallas, TX
Print_ISBN :
0-7803-0219-2
DOI :
10.1109/TDC.1991.169623