DocumentCode
2571537
Title
Sequencing with chain structured precedence constraints and minimal and maximal separation times
Author
Chu, Chengbin ; Jean-Marie Proth
Author_Institution
Projet SAGEP, Inst. Nat. de Recherche en Inf. et Autom.-Lorraine, Metz, France
fYear
1994
fDate
10-12 Oct 1994
Firstpage
333
Lastpage
338
Abstract
Considers a single machine scheduling problem which has been solved for a medical laboratory. In this problem, there are not only chain structured precedence constraints, but also minimal and maximal times separating successive jobs in a same chain. The criterion to be minimized is the makespan. This problem arises particularly in systems where chemical processes are involved. In these systems, jobs are transportation operations and chemical processes can be modeled as chains. Therefore the problem studied in this paper is of practical importance. The authors first state that the problem is NP-complete. As a consequence, the authors propose heuristics for large size problems and a branch and bound algorithm for small size problems. Computational results are reported
Keywords
laboratories; minimisation; scheduling; NP-complete; branch and bound algorithm; chain structured precedence constraints; chemical processes; heuristics; makespan minimisation; medical laboratory; separation times; sequencing; single machine scheduling; transportation operations; Chemical processes; Chemical products; Educational institutions; Job production systems; Laboratories; Road transportation; Scheduling algorithm; Single machine scheduling; Tires;
fLanguage
English
Publisher
ieee
Conference_Titel
Computer Integrated Manufacturing and Automation Technology, 1994., Proceedings of the Fourth International Conference on
Conference_Location
Troy, NY
Print_ISBN
0-8186-6510-6
Type
conf
DOI
10.1109/CIMAT.1994.389052
Filename
389052
Link To Document