• DocumentCode
    2574898
  • Title

    A heuristic approach for scheduling multi-chip packages for semiconductor backend assembly

  • Author

    Chua, T.J. ; Cai, T.X. ; Yin, X.F.

  • Author_Institution
    Singapore Inst. of Manuf. Technol., Singapore
  • fYear
    2007
  • fDate
    25-28 Sept. 2007
  • Firstpage
    1024
  • Lastpage
    1030
  • Abstract
    The processes in which the multi-chip packages (MCP) positions the multiple dies to one lead frame pose great challenges to production scheduling in the semiconductor backend assembly environment. A MCP scheduling problem is also called the multi-pass scheduling problem, as multiple passes are carried out on the same operation sequentially. Such a scheduling problem does not belong to any of the conventional scheduling categories and its constraints are much more complex to tackle. This paper describes a practical realization of a heuristics approach for scheduling MCP problem. The enhanced daily production scheduling (DPS) engine is capable of modeling the real production constraints, resulting in a more realistic and practical schedule which can be followed closely by the production supervisors, eliminating the ad-hoc and error-prone manual practices.
  • Keywords
    assembling; multichip modules; scheduling; semiconductor device manufacture; semiconductor device packaging; daily production scheduling; heuristic approach; multichip packages scheduling; multipass scheduling problem; semiconductor backend assembly; Assembly; Cost function; Energy consumption; Job shop scheduling; Manufacturing processes; Product design; Production systems; Semiconductor device packaging; Single machine scheduling; Wire;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Emerging Technologies and Factory Automation, 2007. ETFA. IEEE Conference on
  • Conference_Location
    Patras
  • Print_ISBN
    978-1-4244-0825-2
  • Electronic_ISBN
    978-1-4244-0826-9
  • Type

    conf

  • DOI
    10.1109/EFTA.2007.4416896
  • Filename
    4416896