DocumentCode :
2582442
Title :
A dynamic scheduling algorithm for time- and resource-constrained task networks
Author :
Hao, Qi ; Xue, Yunjiao ; Wang, Shuying ; Shen, Weiming
Author_Institution :
Centre for Comput.-assisted Constr. Technol., Nat. Res. Council Canada, London, ON, Canada
fYear :
2009
fDate :
11-14 Oct. 2009
Firstpage :
4402
Lastpage :
4407
Abstract :
The resource-constrained project scheduling problem (RCPSP) is an extensively explored area. The existing RCPSP approaches tend to focus on single project scheduling problems without practical support to address the multiple project schedule coordination which involves constraints defined across projects. This paper extends RCPSP by involving time and resource constraints and proposes a practical dynamic task network scheduling algorithm. This algorithm takes time constraints, resource constraints, and particularly the dynamic task execution status into consideration. Dynamic scheduling through a partial task network is considered a unique feature of this algorithm. The proposed algorithm is fully implemented and tested in a web-based aircraft inspection maintenance management system.
Keywords :
scheduling; aircraft inspection maintenance management system; dynamic scheduling; resource-constrained project scheduling problem; task networks; time-constrained task networks; Aircraft; Dynamic scheduling; Heuristic algorithms; Inspection; Job shop scheduling; Maintenance; Processor scheduling; Scheduling algorithm; System testing; Time factors;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Systems, Man and Cybernetics, 2009. SMC 2009. IEEE International Conference on
Conference_Location :
San Antonio, TX
ISSN :
1062-922X
Print_ISBN :
978-1-4244-2793-2
Electronic_ISBN :
1062-922X
Type :
conf
DOI :
10.1109/ICSMC.2009.5346931
Filename :
5346931
Link To Document :
بازگشت