• DocumentCode
    2583620
  • Title

    A constraint-based model for multi-objective repair planning

  • Author

    Barba, I. ; Valle, C. Del ; Borrego, D.

  • Author_Institution
    Dpto. Lenguajes y Sist. Informaticos, Univ. de Sevilla, Sevilla, Spain
  • fYear
    2009
  • fDate
    22-25 Sept. 2009
  • Firstpage
    1
  • Lastpage
    8
  • Abstract
    This work presents a constraint based model for the planning and scheduling of disconnection and connection tasks when repairing faulty components in a system. Since multi-mode operations are considered, the problem involves the ordering and the selection of the tasks and modes from a set of alternatives, using the shared resources efficiently. Additionally, delays due to change of configurations and transportation are considered. The goal is the minimization of two objective functions: makespan and cost. The set of all feasible plans are represented by an extended And/Or graph, that embodies all of the constraints of the problem, allowing non reversible and parallel plans. A simple branch-and-bound algorithm has been used for testing the model with different combinations of the functions to minimize using the weighted-sum approach.
  • Keywords
    process planning; scheduling; tree searching; branch-and-bound algorithm; connection task scheduling; constraint-based model; disconnection task scheduling; multi-mode operations; multi-objective repair planning; weighted-sum approach; Added delay; Artificial intelligence; Constraint optimization; Cost function; Personnel; Process planning; Scheduling algorithm; Testing; Time factors; Transportation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Emerging Technologies & Factory Automation, 2009. ETFA 2009. IEEE Conference on
  • Conference_Location
    Mallorca
  • ISSN
    1946-0759
  • Print_ISBN
    978-1-4244-2727-7
  • Electronic_ISBN
    1946-0759
  • Type

    conf

  • DOI
    10.1109/ETFA.2009.5347038
  • Filename
    5347038