Abstract :
This paper presents a case study in the dangers and consequences involved when the performance of a fast bus transfer scheme becomes unreliable. Current day fast bus transfer system technologies are presented with consideration of replacing an existing system in an operating power plant. Implementation of the new system is presented to provide an understanding of the protection and interlocking controls necessary to provide secure, reliable transfers. Features presently available in system protection components are presented to describe improvements encountered to insure safe operation of the system while making a positive contribution to the successful implementation of a transfer scheme
Keywords :
power generation control; power generation protection; power plants; power stations; power system security; 4160 V; Cheswick generating station; fast bus transfer system; interlocking control; security; system protection; Boilers; Cables; Circuit breakers; Circuit testing; Fires; Personnel; Power generation; Power system protection; Switchgear; Transformers; Bus Transfer; Circuit Breaker Testing; Fastbus; Fiber Optics; Power Generation Auxiliary Systems; Protective Relaying;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Protective Relay Engineers, 2007. 60th Annual Conference for
Conference_Location :
College Station, TX
Print_ISBN :
1-4244-0994-2
Electronic_ISBN :
1-4244-0995-0
Type :
conf
DOI :
10.1109/CPRE.2007.359900
Filename :
4201095
Link To Document :
بازگشت