• DocumentCode
    2587318
  • Title

    The Effective Combination of IPD and CMM: IPD-CMM Process

  • Author

    Jia, Yue ; Han, Rui

  • Author_Institution
    Dept. of Comput. Sci. & Technol., Dalian Neusoft Inst. of Inf., Dalian, China
  • Volume
    2
  • fYear
    2010
  • fDate
    19-20 Dec. 2010
  • Firstpage
    193
  • Lastpage
    195
  • Abstract
    Started with the overview of IPD and CMM, based on the detailed analysis of the relationship between them, the article discussed how the IPD and CMM could be combined effectively and be formatted into the IPD-CMM integrated process, ended with a summary of IPD-CMM process of implementation considerations.
  • Keywords
    Capability Maturity Model; software development management; CMM process; IPD process; capability maturity model; integrated product development; Capability maturity model; Coordinate measuring machines; Decision making; Organizations; Process control; Product development; Software; CMM; IPD; IPD-CMM; process;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Software Engineering (WCSE), 2010 Second World Congress on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-9287-9
  • Type

    conf

  • DOI
    10.1109/WCSE.2010.49
  • Filename
    5718376