DocumentCode :
2587318
Title :
The Effective Combination of IPD and CMM: IPD-CMM Process
Author :
Jia, Yue ; Han, Rui
Author_Institution :
Dept. of Comput. Sci. & Technol., Dalian Neusoft Inst. of Inf., Dalian, China
Volume :
2
fYear :
2010
fDate :
19-20 Dec. 2010
Firstpage :
193
Lastpage :
195
Abstract :
Started with the overview of IPD and CMM, based on the detailed analysis of the relationship between them, the article discussed how the IPD and CMM could be combined effectively and be formatted into the IPD-CMM integrated process, ended with a summary of IPD-CMM process of implementation considerations.
Keywords :
Capability Maturity Model; software development management; CMM process; IPD process; capability maturity model; integrated product development; Capability maturity model; Coordinate measuring machines; Decision making; Organizations; Process control; Product development; Software; CMM; IPD; IPD-CMM; process;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Software Engineering (WCSE), 2010 Second World Congress on
Conference_Location :
Wuhan
Print_ISBN :
978-1-4244-9287-9
Type :
conf
DOI :
10.1109/WCSE.2010.49
Filename :
5718376
Link To Document :
بازگشت