DocumentCode :
2589474
Title :
Implementation and field experience of a national energy control system
Author :
Barazesh, B. ; Vidigal, A. ; Oliveira, H. ; Lobo, O.G. ; Roldão, P. ; Paiva, J. P Sucena ; Barruncho, L. ; Giri, J.
Author_Institution :
Westinghouse Syst. Ltd., Chippenham, UK
fYear :
1989
fDate :
1-5 May 1989
Firstpage :
453
Lastpage :
460
Abstract :
A description is given of the National Control System of Electricidade de Portugal, a two-tier scheme which comprises nine control centers and 60 remote terminal units. This system became operational in 1988. Experience in the energy management system industry shows that projects of this nature have certain requirements in several areas for a smooth completion. These areas include specification of the system, design and application of the purchased product, and the procurement of the system. The authors review the way in which these requirements were addressed in the National Control System Project. Further, the potential areas for functional expansion of the system, the associated technology, and the ease of expansion due to the open nature of the system are discussed.<>
Keywords :
load management; power system computer control; Electricidade de Portugal; National Control System Project; energy management system; national energy control system; Communication system software; Control systems; Electrical equipment industry; Medical services; Power generation; Power systems; Procurement; Production facilities; Spine; Thermal loading;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Industry Computer Application Conference, 1989. PICA '89, Conference Papers
Conference_Location :
Seattle, WA, USA
Type :
conf
DOI :
10.1109/PICA.1989.39030
Filename :
39030
Link To Document :
بازگشت