• DocumentCode
    2589561
  • Title

    Modifying an existing preheater system for improved productivity and efficiency [cement industry]

  • Author

    Alesi, Shane K.

  • fYear
    1990
  • fDate
    22-24 May 1990
  • Firstpage
    389
  • Lastpage
    405
  • Abstract
    The most common problem facing plant operators is the inability to increase clinker production due to limiting preheater fan capabilities. Preheater fan replacement is a very costly and time consuming alternatives. The author deals with alternatives to replacing the preheater fan. These alternatives include modifying the preheater tower for increases in clinker production and improved preheater operating efficiencies
  • Keywords
    cement industry; cement industry; clinker production; efficiency; preheater system; productivity; Cement industry; Costs; Marketing and sales; Personnel; Poles and towers; Production systems; Productivity;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Cement Industry Technical Conference, 1990., XXXII, Record of Conference Papers., IEEE
  • Conference_Location
    Tarpon Springs, FL
  • ISSN
    1079-9931
  • Type

    conf

  • DOI
    10.1109/CITCON.1990.111064
  • Filename
    111064