• DocumentCode
    2591951
  • Title

    Turbogenerator units operating on duo-flash cycle in the Yangbajain geothermal power plant, Tibet, China

  • Author

    Shanben, Qian ; Fangxun, L.I. ; Nianru, L.I.

  • Author_Institution
    Qingdao Steam Turbine Works, Shantong, China
  • fYear
    1989
  • fDate
    6-11 Aug 1989
  • Firstpage
    2151
  • Abstract
    Three 3000-kW geothermal turbogenerator units that have been in successful commercial operation since 1981 in Tibet are discussed. Because of shortage of conventional energy in that region, a double-flash-cycle system was chosen to obtain maximal electrical output. The design features of the units and operational experience with them are described. Suggestions for their optimization are given
  • Keywords
    geothermal power stations; turbogenerators; 3000 kW; China; Tibet; Yangbajain; design features; double-flash-cycle system; electrical output; geothermal power plant; operational experience; optimization; turbogenerator units; Fossil fuels; Geothermal energy; Geothermal power generation; Power generation; Power supplies; Power system modeling; Sea level; Turbines; Turbogenerators; Valves;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Energy Conversion Engineering Conference, 1989. IECEC-89., Proceedings of the 24th Intersociety
  • Conference_Location
    Washington, DC
  • Type

    conf

  • DOI
    10.1109/IECEC.1989.74771
  • Filename
    74771