    Transformer overvoltage problems and countermeasures at black start

  • Author

    Funakoshi, Takahiko ; Furukawa, Koichiro ; Kawachino, Toshihiro ; Takasaki, Shinji ; Shimojo, Toshikazu ; Hirayama, Kaiichirou ; Sogabe, Toshiaki ; Shimamura, Takeo ; Hashimoto, Hidetoshi ; Nohara, Shinichi

  • Author_Institution
    Kyushu Electr. Power Co. Inc., Japan
  • Volume
    2
  • fYear
    2003
  • fDate
    13-17 July 2003
  • Abstract
    A system of Kyushu Electric Power Company Inc. or KEPCO (about 19 GW) belongs to the western Japan system (110 GW) and has a 500-kV and 220-kV transmission line in a loop configuration. Japan´s power system has high reliability and experienced no blackout for the past several decades. However, there is a possibility, though very slight, of a blackout in the event of a big earthquake or unforeseen accident. Considering the risk of blackout, KEPCO has been conducting studies on system restoration. This paper discusses a mechanism of an overvoltage phenomenon during a restoration period in which, about 0.2 seconds or more after a transformer is energized, a voltage becomes maximum in excess of 200% of the rated voltage. The paper also discusses countermeasures against this phenomenon.
  • Keywords
    magnetic flux; overvoltage; power system restoration; power transformers; power transmission lines; 110 GW; 220 kV; 500 kV; Japan; flux saturation; power supply blackout; power system restoration; transformer overvoltage problem; transmission line; Circuit faults; Mesh generation; Power generation; Power system modeling; Power system reliability; Power system restoration; Power transformer insulation; Power transmission; Power transmission lines; Voltage control;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering Society General Meeting, 2003, IEEE
  • Print_ISBN
    0-7803-7989-6
  • Type

    conf

  • DOI
    10.1109/PES.2003.1270363
  • Filename
    1270363