DocumentCode
2594346
Title
Ecoefficiency of universal power supplies for customer premises equipment
Author
Cucchietti, Flavio ; Giacomello, Luca ; Vaccarone, Patrizia ; Rollino, Sara
Author_Institution
Telecom Italia, Torino, Italy
fYear
2011
fDate
9-13 Oct. 2011
Firstpage
1
Lastpage
6
Abstract
The goal of the present study is to provide a comparison between a new common power supplies (CPS) prototype and the old version of power supplies, suitable for powering the same type of device, in order to weigh up according to the Life Cycle Assessment (LCA) approach the possible environmental and energetic implications. The comparison was developed in the framework of the most recent HGI and ETSI specifications and the power supplies considered perform the same services, specifically for a modem/access gateway used for providing the broadband service at customer´s premises. The LCA methodological approach supported the quantitative description of the ecoefficiency of these CPSs and the system boundaries were defined from the cradle to the use phase.
Keywords
power supplies to apparatus; remaining life assessment; CPS; ETSI specifications; HGI specifications; LCA approach; common power supplies; customer premises equipment; energetic implications; environmental implications; life cycle assessment approach; modem-access gateway; universal power supplies; Copper; Logic gates; Manufacturing; Modems; Packaging; Plugs; Strontium; GER; GWP; HGI; common power supply; e-waste; ecoefficiency; energy efficiency; life cycle assessment;
fLanguage
English
Publisher
ieee
Conference_Titel
Telecommunications Energy Conference (INTELEC), 2011 IEEE 33rd International
Conference_Location
Amsterdam
ISSN
2158-5210
Print_ISBN
978-1-4577-1249-4
Electronic_ISBN
2158-5210
Type
conf
DOI
10.1109/INTLEC.2011.6099736
Filename
6099736
Link To Document