• DocumentCode
    2594803
  • Title

    Centralized vs. competitive transmission expansion planning: the need for new tools

  • Author

    Cagigas, Carlota ; Madrigal, Marcelino

  • Author_Institution
    Energy Regul. Comm., Mexico
  • Volume
    2
  • fYear
    2003
  • fDate
    13-17 July 2003
  • Abstract
    Classic transmission expansion methodologies used in vertically integrated systems do not necessarily support competition. Centralized transmission expansion planning of old regimes needs be revised for its suitability in competitive electricity markets. This paper reviews centralized transmission expansion methodologies and its regulatory fundamentals. Using a classic centralized, cost minimization methodology, the paper shows the inconsistencies between centralized and competitive planning of electricity transmission. A proposal for transmission expansion planning is outlined; the proposal applies for electricity markets where a single entity is in charge of determining the transmission expansion plan and takes into account the competitive reactions of participants in the market.
  • Keywords
    cost reduction; power markets; power transmission planning; centralized transmission expansion methodology; competitive electricity markets; cost minimization methodology; electricity transmission; market power; transmission expansion planning; vertically integrated systems; Business; Costs; Electricity supply industry; Minimization methods; Power system modeling; Power system planning; Power system reliability; Power systems; Power transmission lines; Proposals;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering Society General Meeting, 2003, IEEE
  • Print_ISBN
    0-7803-7989-6
  • Type

    conf

  • DOI
    10.1109/PES.2003.1270450
  • Filename
    1270450