DocumentCode :
2595730
Title :
Revenue based maintenance scheduling of a GENCO in restructured power systems
Author :
Tabari, N. Mohammadi ; Pirmoradian, M. ; Hassanpour, S.B.
Author_Institution :
Grad. Sch., Islamic Azad Univ., Tehran
Volume :
2
fYear :
2008
fDate :
14-17 May 2008
Firstpage :
873
Lastpage :
876
Abstract :
In a restructured power system, the problem of maintenance scheduling is different from the traditional centralized power system. This paper is demonstrated how GENCOs (generating companies) in a competitive environment prepare the maintenance schedule of their facilities. Taking into account that in the new structure the main purposes of GENCOs are selling electricity as much as possible and making higher profit, the model is setting up. The model consists of an objective function and related constraints, e.g. maintenance window, generation capacity, load and network flow. We apply the branch-and-bound optimization methodology on a GENCO and finally make a discussion about the simulation results.
Keywords :
maintenance engineering; optimisation; power generation economics; power generation scheduling; power markets; GENCO; branch-and-bound optimization methodology; electricity selling; generating companies; power system restructure; revenue-based maintenance scheduling; Cost function; Electricity supply industry deregulation; Energy consumption; Maintenance; Power engineering and energy; Power generation; Power system modeling; Power system reliability; Power systems; Power transmission lines;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electrical Engineering/Electronics, Computer, Telecommunications and Information Technology, 2008. ECTI-CON 2008. 5th International Conference on
Conference_Location :
Krabi
Print_ISBN :
978-1-4244-2101-5
Electronic_ISBN :
978-1-4244-2102-2
Type :
conf
DOI :
10.1109/ECTICON.2008.4600569
Filename :
4600569
Link To Document :
بازگشت