DocumentCode
2596483
Title
Electromagnetic compatibility design management challenges on Downtown Line (DTL) project
Author
Chu, Michael ; Boon Toon Loi
Author_Institution
Syst. Assurance & Integration Div., Land Transp. Authority, Singapore, Singapore
fYear
2012
fDate
21-24 May 2012
Firstpage
385
Lastpage
388
Abstract
As modern railways deploy more complex and sensitive equipment, railway systems are increasingly vulnerable to electromagnetic interference. Effective Electromagnetic Compatibility (EMC) management is an important integral part of project management in ensuring successful delivery of railway projects. This paper highlights some challenges faced by Land Transport Authority (LTA) in the management of EMC during the DTL project design stage. To effectively address and resolve these challenges, strategy and methodology for future new projects design stage EMC management are revised and adopted.
Keywords
design engineering; electromagnetic compatibility; electromagnetic interference; project management; railway electrification; DTL project design stage; EMC management; LTA; Land Transport Authority; downtown line project; electromagnetic compatibility design management challenges; electromagnetic interference; railway projects; railway systems; Agricultural machinery; Electromagnetic compatibility;
fLanguage
English
Publisher
ieee
Conference_Titel
Electromagnetic Compatibility (APEMC), 2012 Asia-Pacific Symposium on
Conference_Location
Singapore
Print_ISBN
978-1-4577-1557-0
Electronic_ISBN
978-1-4577-1558-7
Type
conf
DOI
10.1109/APEMC.2012.6238020
Filename
6238020
Link To Document