• DocumentCode
    2600582
  • Title

    Scheduling on parallel machines with time constraints and Equipment Health Factors

  • Author

    Obeid, Ali ; Dauzère-Pérès, Stéphane ; Yugma, Claude

  • Author_Institution
    Dept. of Manuf. Sci. & Logistics, Centre Microelectron. de Provence, Gardanne, France
  • fYear
    2012
  • fDate
    20-24 Aug. 2012
  • Firstpage
    401
  • Lastpage
    406
  • Abstract
    In this paper, we are interested in the integration of scheduling and Advanced Process Control (APC) in semiconductor manufacturing. We consider the problem of scheduling jobs of different families on non-identical parallel machines. A special time constraint, associated to each job family, must be satisfied for a machine to remain qualified to process the job family. In addition, we introduce the notion of the risk, modeled as the expected yield resulting from assigning a job to a machine. The objective is to schedule jobs to minimize the combination of three criteria: The sum of completion times, the number of machine disqualification and the sum of expected yield. We propose an integer linear programming model and heuristics to solve this problem. Numerical experiments are reported.
  • Keywords
    integer programming; job shop scheduling; linear programming; parallel machines; process control; advanced process control; equipment health factors; heuristics; integer linear programming model; job family; job scheduling; machine disqualification; nonidentical parallel machines; semiconductor manufacturing; time constraints; Job shop scheduling; Linear programming; Manufacturing; Parallel machines; Process control; Schedules; Time factors;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Automation Science and Engineering (CASE), 2012 IEEE International Conference on
  • Conference_Location
    Seoul
  • ISSN
    2161-8070
  • Print_ISBN
    978-1-4673-0429-0
  • Type

    conf

  • DOI
    10.1109/CoASE.2012.6386346
  • Filename
    6386346