DocumentCode :
2600582
Title :
Scheduling on parallel machines with time constraints and Equipment Health Factors
Author :
Obeid, Ali ; Dauzère-Pérès, Stéphane ; Yugma, Claude
Author_Institution :
Dept. of Manuf. Sci. & Logistics, Centre Microelectron. de Provence, Gardanne, France
fYear :
2012
fDate :
20-24 Aug. 2012
Firstpage :
401
Lastpage :
406
Abstract :
In this paper, we are interested in the integration of scheduling and Advanced Process Control (APC) in semiconductor manufacturing. We consider the problem of scheduling jobs of different families on non-identical parallel machines. A special time constraint, associated to each job family, must be satisfied for a machine to remain qualified to process the job family. In addition, we introduce the notion of the risk, modeled as the expected yield resulting from assigning a job to a machine. The objective is to schedule jobs to minimize the combination of three criteria: The sum of completion times, the number of machine disqualification and the sum of expected yield. We propose an integer linear programming model and heuristics to solve this problem. Numerical experiments are reported.
Keywords :
integer programming; job shop scheduling; linear programming; parallel machines; process control; advanced process control; equipment health factors; heuristics; integer linear programming model; job family; job scheduling; machine disqualification; nonidentical parallel machines; semiconductor manufacturing; time constraints; Job shop scheduling; Linear programming; Manufacturing; Parallel machines; Process control; Schedules; Time factors;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Automation Science and Engineering (CASE), 2012 IEEE International Conference on
Conference_Location :
Seoul
ISSN :
2161-8070
Print_ISBN :
978-1-4673-0429-0
Type :
conf
DOI :
10.1109/CoASE.2012.6386346
Filename :
6386346
Link To Document :
بازگشت