    Time-cost trade-off problem in construction supply chain: A bi-level programming decision model

  • Author

    Jian-hua, Chen ; Wan, Tang

  • Author_Institution
    Sch. of Logistics Eng., Wuhan Univ. of Technol., Wuhan, China
  • fYear
    2010
  • fDate
    24-26 Nov. 2010
  • Firstpage
    212
  • Lastpage
    217
  • Abstract
    A time-cost trade-off problem to optimize net revenue is considered in this paper to discuss the impact of an incentive plan combined with a lump sum contract on the determination of a project´s optimal duration. A bi-level programming decision model is proposed in the viewpoint of the client to discuss the optimal selection of the revenue incentive intensity so as to harmonize the benefit between the client and the contractor and reach a certain equilibrium state. A heuristic algorithm is developed. Furthermore, the influence of some factors on this equilibrium state is analyzed through a numerical example. Results show that revenue-based incentive mechanism is effective in object and benefit coordinating between the two parties of construction supply chain.
  • Keywords
    construction industry; incentive schemes; mathematical programming; supply chain management; bilevel programming decision model; construction supply chain; incentive plan; net revenue; optimal duration; revenue incentive intensity; supply chain management; time-cost trade-off problem; Contracts; Decision making; Heuristic algorithms; Mathematical model; Optimization; Programming; Supply chains; bi-level programming; construction supply chain; incentive mechanism; revenue incentive; time-cost trade-off;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management Science and Engineering (ICMSE), 2010 International Conference on
  • Conference_Location
    Melbourne, VIC
  • ISSN
    2155-1847
  • Print_ISBN
    978-1-4244-8116-3
  • Type

    conf

  • DOI
    10.1109/ICMSE.2010.5719807
  • Filename
    5719807