Time-cost trade-off problem in construction supply chain: A bi-level programming decision model
Author
Jian-hua, Chen ; Wan, Tang
Author_Institution
Sch. of Logistics Eng., Wuhan Univ. of Technol., Wuhan, China
fYear
2010
fDate
24-26 Nov. 2010
Firstpage
212
Lastpage
217
Abstract
A time-cost trade-off problem to optimize net revenue is considered in this paper to discuss the impact of an incentive plan combined with a lump sum contract on the determination of a project´s optimal duration. A bi-level programming decision model is proposed in the viewpoint of the client to discuss the optimal selection of the revenue incentive intensity so as to harmonize the benefit between the client and the contractor and reach a certain equilibrium state. A heuristic algorithm is developed. Furthermore, the influence of some factors on this equilibrium state is analyzed through a numerical example. Results show that revenue-based incentive mechanism is effective in object and benefit coordinating between the two parties of construction supply chain.
Keywords
construction industry; incentive schemes; mathematical programming; supply chain management; bilevel programming decision model; construction supply chain; incentive plan; net revenue; optimal duration; revenue incentive intensity; supply chain management; time-cost trade-off problem; Contracts; Decision making; Heuristic algorithms; Mathematical model; Optimization; Programming; Supply chains; bi-level programming; construction supply chain; incentive mechanism; revenue incentive; time-cost trade-off;
fLanguage
English
Publisher
ieee
Conference_Titel
Management Science and Engineering (ICMSE), 2010 International Conference on
Conference_Location
Melbourne, VIC
ISSN
2155-1847
Print_ISBN
978-1-4244-8116-3
Type
conf
DOI
10.1109/ICMSE.2010.5719807
Filename
5719807
Link To Document