DocumentCode :
2609211
Title :
Nonlinear programming solution for optimum PM schedule of auxiliary components
Author :
Al-Mishari, Salman T. ; Suliman, S.M.A.
Author_Institution :
Saudi Aramco, Dhahran
fYear :
2007
fDate :
2-4 Dec. 2007
Firstpage :
657
Lastpage :
662
Abstract :
Auxiliary components in some systems exist only to serve some other primary components. Preventive maintenance (PM) activities are, therefore, done to these auxiliary components for the sake of extending the life of the primary component. Frequent PM care to auxiliary components increase the cost of PM while infrequent PM leads to increasing downtime of the primary component and, subsequently, production losses. The search for the optimal level of PM care requires a nonlinear programming (NLP) solution that can, sometimes, be very complex. This paper suggests that a very useful pattern exists in the NLP model of this optimization problem which can significantly reduce the complexity of model formulation and the arrival to the NLP solution.
Keywords :
nonlinear programming; preventive maintenance; scheduling; auxiliary components; nonlinear programming solution; optimum PM schedule; preventive maintenance; Costs; Inspection; Machinery; Mechanical engineering; Petroleum; Preventive maintenance; Production facilities; Seals; Solenoids; Valves; Analytical Optimization; Nonlinear Programming; Preventive Maintenance;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Engineering Management, 2007 IEEE International Conference on
Conference_Location :
Singapore
Print_ISBN :
978-1-4244-1529-8
Electronic_ISBN :
978-1-4244-1529-8
Type :
conf
DOI :
10.1109/IEEM.2007.4419272
Filename :
4419272
Link To Document :
بازگشت