DocumentCode :
2610593
Title :
Planning with uncertainties for a heritage building restoration project in Calcutta, India
Author :
Guha, Shion
Author_Institution :
Jadavpur Univ., Calcutta
fYear :
2007
fDate :
2-4 Dec. 2007
Firstpage :
1018
Lastpage :
1021
Abstract :
Planning for a heritage building restoration project is complex because the scope of structural repair can be only ascertained during execution. In addition, workings with traditional materials that are not normally used presently create further difficulties in planning. The restoration for great eastern hotel said to be the oldest hotel in India has been started in Calcutta, India and simultaneously, this study is undertaken to record the uncertainty of project duration and costing. A Gantt chart was prepared at the conception stage. Stakeholders were interviewed to estimate the pessimistic, mean and optimistic duration of each task in the Gantt chart. A Monte Carlo simulation based on a triangular distribution of the estimated time variations is conducted to estimate the statistics of duration. The Gantt chart is revised and simulation process is repeated with the progress of the project. The temporal distribution of time periods and associated deviations found from simulations are compared. Similar exercise is also executed for estimated costing at the various planning stages. The study indicates that a traditional Gantt chart estimate is not accurate for a project where a number of factors are unknown at the inception.
Keywords :
Monte Carlo methods; bar charts; building; estimation theory; maintenance engineering; planning; project management; statistical distributions; structural engineering; Calcutta, India; Gantt chart; Monte Carlo simulation; duration statistics estimation; eastern hotel restoration; heritage building restoration project planning; structural repair; temporal distribution; time variation estimation; triangular distribution; Building materials; Costing; Interference; Job shop scheduling; Project management; Statistical distributions; Technological innovation; Tiles; Uncertainty; Watches; Gantt chart; Heritage building; Monte Carlo Simulation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Engineering Management, 2007 IEEE International Conference on
Conference_Location :
Singapore
Print_ISBN :
978-1-4244-1529-8
Electronic_ISBN :
978-1-4244-1529-8
Type :
conf
DOI :
10.1109/IEEM.2007.4419346
Filename :
4419346
Link To Document :
بازگشت