• DocumentCode
    2611059
  • Title

    Manpower allocation in an asynchronous production line with leveled labor

  • Author

    Wu, K.Y. ; Lai, H.F. ; Ho, C.Y.

  • Author_Institution
    Nat. United Univ., Miaoli
  • fYear
    2007
  • fDate
    2-4 Dec. 2007
  • Firstpage
    1158
  • Lastpage
    1162
  • Abstract
    Allocations of the buffer, the server and the workload for enhancing productivity are commonly addressed in serial production lines. This paper presents a framework for allocating the manpower in an asynchronous production line with operators leveled according to different degrees of skill. Throughput is considered as a performance index for measuring a manpower plan. A max-min-sum linear fractional model is proposed to find a promising workload allocation. Based on the preliminary model, an approach for dispatching each operator to appropriate stations is developed. Furthermore, a formula for estimating the requirements for the buffer space is given. In extension, the proposed model can be employed to determine capacity expansion with both workforce and machine additions.
  • Keywords
    human resource management; labour resources; minimax techniques; production management; productivity; asynchronous production line; manpower allocation; max-min-sum linear fractional model; productivity; serial production lines; workload allocation; Capacity planning; Councils; Dispatching; Flow production systems; Machinery production industries; Manufacturing industries; Manufacturing systems; Performance analysis; Productivity; Throughput; Capacity planning; fractional programming; serial production lines; workload allocation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management, 2007 IEEE International Conference on
  • Conference_Location
    Singapore
  • Print_ISBN
    978-1-4244-1529-8
  • Electronic_ISBN
    978-1-4244-1529-8
  • Type

    conf

  • DOI
    10.1109/IEEM.2007.4419374
  • Filename
    4419374