DocumentCode
2611817
Title
Competitiveness Criterion and Evaluation Approach of AGC Market
Author
Mu, Tao ; Kang, Chongqing ; Guo, Lin ; Xia, Qing
Author_Institution
Dept. of Electr. Eng., Tsinghua Univ., Beijing
fYear
2005
fDate
2005
Firstpage
1
Lastpage
5
Abstract
Automatic generation control (AGC) is an important ancillary service in power system. In a real system with fixed installed capacity, how to judge whether a competitive AGC market should be opened or not remains to be a critical question. Since qualitative evaluations are not good enough for answering this question, theoretical supports and quantitative indexes need to be proposed. Thus, the competitiveness criterion of AGC market and the corresponding evaluation approach are studied in this paper. The assessment process is composed of five steps, i.e. analysis of initial data, operation status analysis of AGC units, calculation of maximum AGC capacity in the system, calculation of available AGC capacity in the system, and evaluation of competitiveness in AGC market. The proposed assessment process is used in power system of Chongqing, south-central China. The evaluation results are demonstrated in this paper, showing that this method is efficient
Keywords
power generation control; power markets; AGC market; China; Chongqing power system; automatic generation control; competitiveness criterion; Automatic generation control; Control systems; Data analysis; Electricity supply industry; Power generation; Power system analysis computing; Power system control; Power system security; Power systems; ancillary services; automatic generation control (AGC); competitiveness criterion; electricity market; evaluation;
fLanguage
English
Publisher
ieee
Conference_Titel
Transmission and Distribution Conference and Exhibition: Asia and Pacific, 2005 IEEE/PES
Conference_Location
Dalian
Print_ISBN
0-7803-9114-4
Type
conf
DOI
10.1109/TDC.2005.1546829
Filename
1546829
Link To Document