• DocumentCode
    2613667
  • Title

    Challenges of Using Partial Discharge Measurements for Predictive Maintenance

  • Author

    Abdel-Galil, T.K. ; Habiballah, I.O.

  • Author_Institution
    King Fahd Univ. of Pet. & Miner., Dhahran
  • fYear
    2005
  • fDate
    2005
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    This paper addresses the existing partial discharge (PD) measuring and detecting techniques which can be utilized by the utilities in their predictive maintenance programs. It also identifies the challenges which face utility engineers in collecting and analyzing partial discharge data. After addressing and highlighting these challenges, the paper discusses necessary research effort and methodologies to overcome these challenges
  • Keywords
    maintenance engineering; partial discharge measurement; partial discharge measurements; predictive maintenance; Acoustic signal detection; Face detection; Partial discharge measurement; Partial discharges; Petroleum; Phase measurement; Predictive maintenance; Pulse measurements; Shape measurement; Voltage; High voltage; partial discharge; predictive maintenance;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Transmission and Distribution Conference and Exhibition: Asia and Pacific, 2005 IEEE/PES
  • Conference_Location
    Dalian
  • Print_ISBN
    0-7803-9114-4
  • Type

    conf

  • DOI
    10.1109/TDC.2005.1546927
  • Filename
    1546927