DocumentCode :
2614052
Title :
Reliability centered maintenance implementation in Hydro-Quebec transmission system
Author :
Rajotte, Claude ; Jolicoeur, Alain
fYear :
2000
fDate :
2000
Firstpage :
375
Lastpage :
381
Abstract :
In today´s competitive market, utilities want to optimize their maintenance efforts in order to maximize equipment reliability and availability at lowest cost. Thus, utilities want to know as much as possible the real condition of equipment by the use of an optimal SPM (systematic preventive maintenance) program. An SPM program usually defines “what to do” and “when to do” SPM actions. The “what” and the “when” are of course closely related because for any inappropriate task selection, there won´t be any appropriate task interval that will prevent failure. Inversely, appropriate actions performed at an inappropriate interval will lead to a nonoptimized SPM program (too expensive or poor apparatus reliability). The RCM method is very effective to select “what to do” in a SPM program. Optimal task interval (“when to do”) is rather defined by the use of historical data and experience or, for some utilities, by economical evaluation
Keywords :
failure analysis; maintenance engineering; power transmission reliability; Hydro-Quebec transmission system; TransEnergie; availability maximisation; economical evaluation; equipment reliability maximisation; failure modes; optimal task interval; reliability centered maintenance; systematic preventive maintenance; Circuit breakers; Cost function; Delay; Monitoring; Power transformers; Power transmission lines; Preventive maintenance; Scanning probe microscopy; Substations; Switches;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Transmission and Distribution Construction, Operation and Live-Line Maintenance Proceedings. 2000 IEEE ESMO - 2000 IEEE 9th International Conference on
Conference_Location :
Montreal, Que.
Print_ISBN :
0-7803-6625-5
Type :
conf
DOI :
10.1109/TDCLLM.2000.882854
Filename :
882854