• DocumentCode
    2614248
  • Title

    Live re-stringing of 138 kV lines

  • Author

    Gela, George ; Ferraro, Ray ; Verdecchio, Tom

  • fYear
    2000
  • fDate
    2000
  • Firstpage
    404
  • Lastpage
    409
  • Abstract
    This paper reports on research to develop new safe procedures for re-stringing an energized double-circuit 138 kV transmission line. The re-stringing operation requires the installation of a large stringing block and the removal, when necessary, of two insulator units from the string. This alters the worksite withstand characteristics significantly and lowers its insulation level. However, tests have shown that live working procedures could be developed for such a task, provided appropriate precautions are taken
  • Keywords
    impulse testing; insulators; maintenance engineering; power overhead lines; 138 kV; insulation level lowering; insulator units; live re-stringing; live working procedures; safe procedures; transmission line; worksite withstand characteristics; Circuit testing; Insulation; Poles and towers; Porcelain; Transmission lines;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Transmission and Distribution Construction, Operation and Live-Line Maintenance Proceedings. 2000 IEEE ESMO - 2000 IEEE 9th International Conference on
  • Conference_Location
    Montreal, Que.
  • Print_ISBN
    0-7803-6625-5
  • Type

    conf

  • DOI
    10.1109/TDCLLM.2000.882864
  • Filename
    882864