This paper reports on research to develop new safe procedures for re-stringing an energized double-circuit 138 kV transmission line. The re-stringing operation requires the installation of a large stringing block and the removal, when necessary, of two insulator units from the string. This alters the worksite withstand characteristics significantly and lowers its insulation level. However, tests have shown that live working procedures could be developed for such a task, provided appropriate precautions are taken
Keywords
impulse testing; insulators; maintenance engineering; power overhead lines; 138 kV; insulation level lowering; insulator units; live re-stringing; live working procedures; safe procedures; transmission line; worksite withstand characteristics; Circuit testing; Insulation; Poles and towers; Porcelain; Transmission lines;
fLanguage
English
Publisher
ieee
Conference_Titel
Transmission and Distribution Construction, Operation and Live-Line Maintenance Proceedings. 2000 IEEE ESMO - 2000 IEEE 9th International Conference on
Conference_Location
Montreal, Que.
Print_ISBN
0-7803-6625-5
Type
conf
DOI
10.1109/TDCLLM.2000.882864
Filename
882864
Link To Document