Optimal Multi-Objective VAr Planning Using Accelerated Ant Colony and Analytical Hierarchy Process Methods
Author :
Ghazi, R. ; Arabpour, A.
Author_Institution :
Electr. Eng. Dept., Ferdowsi Univ. of Mashhad
fYear :
2005
fDate :
2005
Firstpage :
1
Lastpage :
7
Abstract :
The aim of reactive power (VAr) planning is to provide the system with sufficient VAr sources to enable the system to be operated under economically conditions. The VAr planning problem is a constrained, multi-objective non-differentiable optimization problem. The VAr problem is first formulated as a multi-objective problem. This formulation considers different objective functions related to real power losses, investment cost of VAr sources, installation and maintenance cost, voltage deviation and security margin with equality and inequality constraints. Second the objective functions are weighted by analytical hierarchy process (AHP), so the multi-objective optimization problem is converted into single objective function. Third the weak bus and heavy load bus oriented criterions are used to determine the candidate buses for installing new VAr sources. Then an ant colony algorithm which is based on the foraging behavior of ants is developed to solve this problem. This proposed method has been applied on the modified IEEE 14 bus system
Keywords :
artificial life; installation; investment; load flow; losses; maintenance engineering; optimisation; power system analysis computing; power system economics; power system planning; power system security; reactive power; IEEE 14 bus system; VAr planning problem; accelerated ant colony; analytical hierarchy process methods; installation cost; investment cost; load flow; maintenance cost; optimal multiobjective nondifferentiable optimization problem; power losses; reactive power; security margin; voltage deviation; Acceleration; Ant colony optimization; Constraint optimization; Cost function; Investments; Power generation economics; Power system economics; Power system planning; Process planning; Reactive power; VAr Planning; accelerated ant colony; analytical hierarchy process; load flow;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Transmission and Distribution Conference and Exhibition: Asia and Pacific, 2005 IEEE/PES
Conference_Location :
Dalian
Print_ISBN :
0-7803-9114-4
Type :
conf
DOI :
10.1109/TDC.2005.1547158
Filename :
1547158
Link To Document :
بازگشت