DocumentCode :
2617555
Title :
How to consider reliability aspects in the energy management of the Brazilian hydro dominated system
Author :
Filho, X. Vieira ; Oliveira, A. ; Mello, J. C O ; Pilotto, L.A.S. ; Arteiro, F. ; Vieira, M.A.M.
fYear :
2004
fDate :
10-13 Oct. 2004
Firstpage :
1372
Abstract :
System expansion in Brazil has been historically planned considering a deterministic criterion based on an energy deficit risk equal to 5%, associated to unfavorable hydrological conditions. This criterion is adopted independently of the economic impact (deficit cost) of the energy rationing. This paper proposes new expansion planning procedures for hydro dominated systems. The proposed methodology incorporates aspects related to costs of the deficit and the energy not supplied associated to energetic and electric reliability, respectively. The methodology is illustrated considering a configuration of the Brazilian interconnected system for 2004. Results are presented and discussed.
Keywords :
costing; hydroelectric power stations; power generation economics; power generation planning; power generation reliability; power system interconnection; risk analysis; Brazilian interconnected system; deficit risk cost; economic impact; electric reliability; energy management; expansion planning; hydro dominated system; hydrological condition; optimization; Capacity planning; Costs; Energy management; Investments; Natural gas; Nuclear power generation; Power generation economics; Power system planning; Power system reliability; Signal generators;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Systems Conference and Exposition, 2004. IEEE PES
Print_ISBN :
0-7803-8718-X
Type :
conf
DOI :
10.1109/PSCE.2004.1397686
Filename :
1397686
Link To Document :
بازگشت