DocumentCode
2619691
Title
Research on the optimization of ERW pipe scheduling based on theory of constraints
Author
Dong, Shaohua ; Hu, Junjie
Author_Institution
Sch. of Mech. Eng., Univ. of Sci. & Technol. Beijing, Beijing, China
fYear
2011
fDate
27-29 June 2011
Firstpage
1656
Lastpage
1658
Abstract
In this paper, the bottleneck process in the production of Electric Resistance Weld pipe is identified and an optimal production plan model whit earliness and tardiness penalties is built. Based on the model, a genetic algorithm is designed. The computation results show the effectiveness of the model and the algorithm.
Keywords
constraint theory; electric resistance; genetic algorithms; pipes; scheduling; welds; ERW pipe scheduling; constraint theory; electric resistance weld pipe production; genetic algorithm; optimal production plan model; optimization; Computational modeling; Job shop scheduling; Manufacturing; Mechanical engineering; Processor scheduling; Resistance; ERW Pipe; GA; Production Plan; Theory of Constraints;
fLanguage
English
Publisher
ieee
Conference_Titel
Computer Science and Service System (CSSS), 2011 International Conference on
Conference_Location
Nanjing
Print_ISBN
978-1-4244-9762-1
Type
conf
DOI
10.1109/CSSS.2011.5974641
Filename
5974641
Link To Document