    The challenge of regulatory compliance testing of a large distributed system

  • Author

    Braxton, Thomas E.

  • Author_Institution
    Lucent Technol., AT&T Bell Labs., Naperville, IL, USA
  • Volume
    2
  • fYear
    1998
  • fDate
    24-28 Aug 1998
  • Firstpage
    711
  • Abstract
    Though test procedures specified by standards bodies provide direction in the technical steps that are to be taken in performing a large-system EMC test, the management of such a project has not been widely discussed. In the case of a large distributed system, the organization, preparation and test execution become a logistical challenge. This paper reviews experience in performing such tests, provides observations on the planning process, and gives recommendations to regulatory engineers and developers who plan to perform an EMC test on a such a large scale
  • Keywords
    electromagnetic compatibility; legislation; project management; testing; EMC test; large distributed system; large-system EMC test; planning process observations; project management; regulatory compliance testing; regulatory engineers; standards bodies; Assembly; Circuit testing; Electromagnetic compatibility; FCC; Immune system; Large-scale systems; Performance evaluation; Process planning; Standards organizations; System testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electromagnetic Compatibility, 1998. 1998 IEEE International Symposium on
  • Conference_Location
    Denver, CO
  • Print_ISBN
    0-7803-5015-4
  • Type

    conf

  • DOI
    10.1109/ISEMC.1998.750285
  • Filename
    750285