DocumentCode
2622695
Title
Experimental study on the large power transformer unit temperature variation
Author
Chiulan, Traian ; Pantelimon, Brandusa
Author_Institution
Energy Efficiency Res. Center, Nat. Energy Res. Inst., Bucharest
fYear
2008
fDate
22-24 May 2008
Firstpage
161
Lastpage
166
Abstract
The monitoring systems of the transformer units are developed according to their loading guides, as their manufacturers specify. The problem that arises is due to the fact that the thermal models of the diverse versions of the loading guides do not yield similar results. Therefore, different values may be obtained for the same transformer unit with different monitoring systems. That is why the values provided by these systems and the standard thermal model should be compared. Another aspect, as important as the previous one; refers to the thermal model parameters that should be specified by the transformer unit manufacturers. The paper presents a mobile installation that was developed to perform these measurements and the results obtained on two 200 MVA power transformer units.
Keywords
condition monitoring; power transformers; loading guides; monitoring systems; power transformer unit temperature variation; thermal model; Condition monitoring; Current transformers; IEC standards; Job shop scheduling; Manufacturing; Oil insulation; Petroleum; Power transformers; Temperature measurement; Thermal loading;
fLanguage
English
Publisher
ieee
Conference_Titel
Optimization of Electrical and Electronic Equipment, 2008. OPTIM 2008. 11th International Conference on
Conference_Location
Brasov
Print_ISBN
978-1-4244-1544-1
Electronic_ISBN
978-1-4244-1545-8
Type
conf
DOI
10.1109/OPTIM.2008.4602360
Filename
4602360
Link To Document