• DocumentCode
    2626410
  • Title

    The Baltimore Central Light Rail Line light rail vehicle procurement

  • Author

    Edris, Hal ; Causey, Ross

  • Author_Institution
    Maryland Mass Transit Adm., Baltimore, MD, USA
  • fYear
    1995
  • fDate
    4-6 Apr 1995
  • Firstpage
    47
  • Lastpage
    53
  • Abstract
    This paper describes how the Baltimore Light Rail Vehicle (LRV) specification was developed so quickly, the unique characteristics of the vehicle, and the successful procurement, testing, and use of the vehicle in revenue service. The Baltimore LRV procurement was a critical path activity because the Maryland Mass Transit Administration (MTA) adopted a fast track procurement process. The specification was developed in 90 days, and supplier selection was completed within an additional 90 days. Meetings with potential suppliers were conducted to assess their ability to provide nonstandard features and minimize technical risks to the MTA. The focus of the specification development was on high-risk areas such as AC propulsion. Life-cycle costs were developed that compared AC and DC propulsion technologies to determine long term benefits of reduced maintenance costs. The specification addressed traditionally weak areas such as system integration, design for maintainability, ergonomics, and the design review process. During the system design review with civil designers, emphasis was placed on the complex alignment throughout the downtown business district. A total quality assurance inspection and test plan was developed and implemented at the manufacturer´s facility to ensure conformance to work scope, vehicle configuration control from the baseline build, and first article inspections of major assemblies. Vehicle testing included a complete set of performance tests to verify acceleration and braking rates
  • Keywords
    braking; inspection; maintenance engineering; quality control; railways; rapid transit systems; AC propulsion; Baltimore Central Light Rail Line; Baltimore Light Rail Vehicle specification; DC propulsion; Maryland Mass Transit Administration; acceleration rates; braking rates; critical path activity; design for maintainability; design review process; downtown business district alignment; ergonomics; fast track procurement process; life-cycle costs; light rail vehicle procurement; performance tests; reduced maintenance costs; supplier selection; system integration; technical risks minimisation; total quality assurance inspection; vehicle configuration control; vehicle testing; Costs; Ergonomics; Inspection; Light rail systems; Process design; Procurement; Propulsion; Quality assurance; Testing; Vehicles;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Railroad Conference, 1995., Proceedings of the 1995 IEEE/ASME Joint
  • Conference_Location
    Baltimore, MD
  • Print_ISBN
    0-7803-2556-7
  • Type

    conf

  • DOI
    10.1109/RRCON.1995.395170
  • Filename
    395170