DocumentCode
2626800
Title
Implicit enumeration based 0–1 integer programming for generation maintenance scheduling
Author
Tabari, Nima Mohammadi ; Pirmoradian, Mahdi ; Hassanpour, Seiiedeh Bahareh
Author_Institution
Control Dept., Islamic Azad Univ., Tehran
fYear
2008
fDate
21-25 July 2008
Firstpage
151
Lastpage
154
Abstract
This paper presents an implicit enumeration based 0-1 integer programming methodology for finding the optimum preventive maintenance schedule of generating units. The objective function is to maintain the units as earlier as possible. Various constraints such as spinning reserve, duration of maintenance and maintenance crew are being taken into account. In a case study, using the power system of the first reference with six generating units, and implying implicit enumeration, we obtain one optimum solution and seven other feasible solutions. Finally with respect to the mentioned reference, we make a conclusion.
Keywords
integer programming; power generation scheduling; preventive maintenance; 0-1 integer programming; implicit enumeration; optimum preventive maintenance scheduling; power system generating unit; Costs; Integer linear programming; Job shop scheduling; Linear programming; Power generation; Power generation economics; Power system reliability; Preventive maintenance; Processor scheduling; Region 8;
fLanguage
English
Publisher
ieee
Conference_Titel
Computational Technologies in Electrical and Electronics Engineering, 2008. SIBIRCON 2008. IEEE Region 8 International Conference on
Conference_Location
Novosibirsk
Print_ISBN
978-1-4244-2133-6
Electronic_ISBN
978-1-4244-2134-3
Type
conf
DOI
10.1109/SIBIRCON.2008.4602605
Filename
4602605
Link To Document