Title :
Revenue based maintenance scheduling of a GENCO in restructured power systems
Author :
Tabari, Nima Mohammadi ; Pirmoradian, Mahdi ; Hassanpour, Seiiedeh Bahareh
Author_Institution :
Control Dept., Islamic Azad Univ., Tehran
Abstract :
In a restructured power system, the problem of maintenance scheduling is different from the traditional centralized power system. This paper is demonstrated how GENCOs (generating companies) in a competitive environment prepare the maintenance schedule of their facilities. Taking into account that in the new structure the main purposes of GENCOs are selling electricity as much as possible and making higher profit, the model is setting up. The model consists of an objective function and related constraints, e.g. maintenance window, generation capacity, load and network flow. We apply the branch-and-bound optimization methodology on a GENCO and finally make a discussion about the simulation results.
Keywords :
maintenance engineering; power generation economics; power system management; GENCO; centralized power system; generating companies; restructured power systems; revenue based maintenance scheduling; Cost function; Electricity supply industry deregulation; Energy consumption; Maintenance; Power generation; Power system control; Power system modeling; Power system reliability; Power systems; Power transmission lines;
Conference_Titel :
Computational Technologies in Electrical and Electronics Engineering, 2008. SIBIRCON 2008. IEEE Region 8 International Conference on
Conference_Location :
Novosibirsk
Print_ISBN :
978-1-4244-2133-6
Electronic_ISBN :
978-1-4244-2134-3
DOI :
10.1109/SIBIRCON.2008.4602633