DocumentCode :
2629948
Title :
Planning Of Telecommunication Power Supply Standpoint Of Architect Planner
Author :
Krusnicky, K.
Author_Institution :
Kratos Engineering, Commercial and Service Ltd., Hungary
fYear :
1997
fDate :
24-24 April 1997
Firstpage :
405
Lastpage :
410
Keywords :
AC generators; Battery charge measurement; Buildings; Cost function; DC generators; Investments; Power engineering and energy; Power measurement; Power supplies; Telecommunication switching;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Telecommunications Energy Special Conference, 1997. Telescon 97 Budapest., The Second International
Conference_Location :
Budapest, Hungary
Print_ISBN :
963-8111-62-3
Type :
conf
DOI :
10.1109/TELESC.1997.655743
Filename :
655743
Link To Document :
بازگشت