DocumentCode :
2633010
Title :
Rectifier design-project challenges
Author :
Rubinstein, Daniel
Author_Institution :
Comlo Pty Ltd., NSW, Australia
fYear :
2000
fDate :
2000
Firstpage :
274
Lastpage :
281
Abstract :
A telecom rectifier development process is presented from a project perspective looking at the conflicting and sometimes ambiguous requirements from a product in commercially realistic environment. An approach to mitigate the above drawbacks is presented
Keywords :
AC-DC power convertors; product development; rectifying circuits; telecommunication power supplies; commercially realistic environment; development process; product requirements; project challenges; rectifier design; telecommunication rectifier; Australia; Delay; Environmental management; Feedback loop; Market opportunities; Output feedback; Project management; Rectifiers; Telecommunications; Testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Telecommunications Energy Conference, 2000. INTELEC. Twenty-second International
Conference_Location :
Phoenix, AZ
Print_ISBN :
0-7803-6407-4
Type :
conf
DOI :
10.1109/INTLEC.2000.884261
Filename :
884261
Link To Document :
بازگشت