• DocumentCode
    2633010
  • Title

    Rectifier design-project challenges

  • Author

    Rubinstein, Daniel

  • Author_Institution
    Comlo Pty Ltd., NSW, Australia
  • fYear
    2000
  • fDate
    2000
  • Firstpage
    274
  • Lastpage
    281
  • Abstract
    A telecom rectifier development process is presented from a project perspective looking at the conflicting and sometimes ambiguous requirements from a product in commercially realistic environment. An approach to mitigate the above drawbacks is presented
  • Keywords
    AC-DC power convertors; product development; rectifying circuits; telecommunication power supplies; commercially realistic environment; development process; product requirements; project challenges; rectifier design; telecommunication rectifier; Australia; Delay; Environmental management; Feedback loop; Market opportunities; Output feedback; Project management; Rectifiers; Telecommunications; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Telecommunications Energy Conference, 2000. INTELEC. Twenty-second International
  • Conference_Location
    Phoenix, AZ
  • Print_ISBN
    0-7803-6407-4
  • Type

    conf

  • DOI
    10.1109/INTLEC.2000.884261
  • Filename
    884261