DocumentCode :
2633716
Title :
Challenges and lessons learned from commissioning an IEC 61850-90-5 based synchrophasor system
Author :
Madani, Vahid ; Picard, Stephan ; Yujie Yin ; Adamiak, Mark
Author_Institution :
PG&E, USA
fYear :
2015
fDate :
March 30 2015-April 2 2015
Firstpage :
842
Lastpage :
849
Abstract :
This paper describes the commissioning methodologies and roadmap for an IEC 61850-90-5 based synchrophasor system, including PMUs, PDCs, IRIG-B and IEEE 1588 GPS clocks, synchrophasor streaming protocols and historian storage. It especially addresses lessons during the commissioning of this large-scale synchrophasor system deployment.
Keywords :
phasor measurement; IEC 61850-90-5 based synchrophasor system; IEEE 1588 GPS clocks; IRIG-B; PDC; PMU; historian storage; synchrophasor streaming protocols; Aggregates; Clocks; IEC standards; Phasor measurement units; Substations; Testing; Commissioning; PDC; PMU; Synchrophasor;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Protective Relay Engineers, 2015 68th Annual Conference for
Conference_Location :
College Station, TX
Print_ISBN :
978-1-4799-8721-4
Type :
conf
DOI :
10.1109/CPRE.2015.7102208
Filename :
7102208
Link To Document :
بازگشت