DocumentCode
2634699
Title
Battery-aware task scheduling in distributed mobile systems with lifetime constraint
Author
Li, Jiayin ; Qiu, Meikang ; Niu, Jian-Wei ; Chen, Tianzhou
Author_Institution
Dept. of Electr. & Comp. Eng., Univ. of Kentucky, Lexington, KY, USA
fYear
2011
fDate
25-28 Jan. 2011
Firstpage
743
Lastpage
748
Abstract
A distributed mobile system consists of a group of heterogeneous mobile devices connected by wireless network. Due to the fact that most of the mobile devices are battery based, the lifetime of a mobile system depends on both the battery behavior and the energy consumption characteristics of tasks. In this paper, we present a set of models for task scheduling in mobile systems equipped with Dynamic Voltage Scaling (DVS) processors. We propose battery-aware algorithms to obtain task schedules satisfying the battery lifetime constraints. The simulations with randomly generated Directed Acyclic Graphs (DAG) show that our proposed algorithms generate better schedules that can satisfy the battery lifetime constraints.
Keywords
distributed processing; mobile computing; power aware computing; radio networks; scheduling; battery lifetime constraints; battery-aware task scheduling; directed acyclic graphs; distributed mobile systems; dynamic voltage scaling processors; energy consumption; lifetime constraint; wireless network; Batteries; Biological system modeling; Energy consumption; Mobile communication; Program processors; Schedules; Voltage control; Battery-aware; battery behavior; lifetime constraint; task scheduling;
fLanguage
English
Publisher
ieee
Conference_Titel
Design Automation Conference (ASP-DAC), 2011 16th Asia and South Pacific
Conference_Location
Yokohama
ISSN
2153-6961
Print_ISBN
978-1-4244-7515-5
Type
conf
DOI
10.1109/ASPDAC.2011.5722286
Filename
5722286
Link To Document