• DocumentCode
    2636123
  • Title

    The Channel Tunnel power supplies

  • Author

    Bayliss, C.R.

  • fYear
    1995
  • fDate
    27-30 Mar 1995
  • Firstpage
    44
  • Lastpage
    63
  • Abstract
    The traction and auxiliary power supply system for the Channel Tunnel is unusual in that it has two independent sources of supply from France and the UK with no intermediate access for feed points being possible. Further the French and British grid systems cannot be paralleled through an electrically weak AC link. The Tunnel system loads are therefore shared on a 50/50 basis between the two sources of supply. This paper concentrates on some of these particularly interesting technical and management aspects of the Channel Tunnel power and traction systems designs
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Electric Railways in a United Europe, 1995., International Conference on
  • Conference_Location
    Amsterdam
  • Print_ISBN
    0-85296-631-8
  • Type

    conf

  • DOI
    10.1049/cp:19950178
  • Filename
    396057