DocumentCode :
2642121
Title :
Relation between skill revel and input-output time delay
Author :
Hidaka, Koichi ; Saida, Kazumasa ; Suzuki, Satoshi
Author_Institution :
Department of Electrical Engineering, Tokyo Denki University, Japan
fYear :
2006
fDate :
4-6 Oct. 2006
Firstpage :
557
Lastpage :
561
Abstract :
In this paper, we try to obtain knowledge about human skill on machine operation, using data measured by simple test, and analyze up-skilling. In order to obtain experimental data for human manipulation, we utilize a tele operated robot system. For the tele operation, it is necessary that human operates machine by using image information from display monitor. We aim at the acquisition of evaluation quantity about state of skill, and pay attention to delay time during the machine operation. For the skill, we investigated correlation with response delay time of human operation and control characteristics of the operations. We confirmed a possibility of quantification of progress of the up-skilling.
Keywords :
Condition monitoring; Control systems; Delay effects; Displays; Humans; Mechatronics; Robots; Testing; Time factors; Time measurement; human skillARX; machine operation; time-delay;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Computer Aided Control System Design, 2006 IEEE International Conference on Control Applications, 2006 IEEE International Symposium on Intelligent Control, 2006 IEEE
Conference_Location :
Munich, Germany
Print_ISBN :
0-7803-9797-5
Electronic_ISBN :
0-7803-9797-5
Type :
conf
DOI :
10.1109/CACSD-CCA-ISIC.2006.4776706
Filename :
4776706
Link To Document :
بازگشت